Passive regeneration depends on the engine doing its job: running hot enough, for long enough. When a DG set cannot be relied on to do that, a retrofit emission control device may add its own heat. The two common routes are electric-heater regeneration and fuel-assisted regeneration, where a burner, a dosing system or a similar arrangement uses diesel to raise the temperature of the filter.

From the buyer’s chair the choice looks technical, but it is really a question about your site: how your set is loaded, how your electrical system is arranged, what hazards your site can accept and who will maintain the device. This article compares the two approaches on the things that matter in procurement, offers a scorecard you can adapt, matches four typical site profiles to the likely best fit, works through an illustrative energy-cost example and ends with questions to put to suppliers.

Many RECD designs use neither. Passive regeneration with a catalyst, operator-initiated loaded runs and designs with removable filters for off-site cleaning are all valid. If your duty cycle is generous, you may not need assisted regeneration at all. Our guide to active versus passive RECD regeneration explains where each approach fits.

What the two methods actually do

Electric-heater regeneration

An electric heating element, installed in or upstream of the filter, raises the temperature of the exhaust gas or the filter face to a point where soot ignites. The soot then burns on its own heat, sometimes with the heater switched off partway through. The DG set (or the grid, when available) supplies the electrical energy.

Strengths. No fuel line or burner in the plant room. Heat input is easy to control and measure. Controllers can log heater current and time, which gives clear evidence of what happened. The engineering is closer to ordinary electrical practice.

Limits. It needs a substantial, reliable electrical supply that is available when the DG is running. The heater and its contactor are wear items. If the heater is fed from a grid-only circuit, it will not work during an outage, which is exactly when many sets run. The DG must carry the extra load. An introductory NPTEL lecture on active regeneration notes that a typical electric regeneration heater on a truck filter draws about 3 kW and needs strong battery backup or a garage-based cycle (NPTEL). On a DG set the equivalent question is whether the essential board can carry the heater.

Fuel-assisted regeneration

Here a burner, a fuel-dosing arrangement or a similar fuel-based system adds heat. In some designs diesel is burned in a small burner ahead of the filter. In others, fuel is injected and oxidised over a catalyst to create heat.

Strengths. Fuel carries a lot of energy in a small volume, so a modest fuel flow can deliver substantial heat. The approach does not draw heavily on the electrical system.

Limits. Fuel lines, pumps, nozzles and ignition components are added to the exhaust area. These need clean fuel, correct air supply and good control. Burners can foul, flood or fail to ignite, and hot exhaust areas with liquid fuel call for careful safety design. Oxygen content in exhaust also varies with engine load, which makes burner operation harder in a stream that is not fresh air.

A third route: load-bank-assisted regeneration

Some systems avoid a heater or burner and instead raise engine load artificially. Johnson Matthey describes an ActivDPF arrangement that pairs a catalysed filter with an integrated load bank so regeneration can happen even when site load is too low for passive regeneration, and it notes that one load bank can serve several gensets (Johnson Matthey). It is a stationary-generator approach, so ask suppliers whether it fits your plant room and fuel use.

Context from the wider field

Research on diesel particulate filters offers a useful backdrop. The US Department of Energy’s materials on electrically assisted diesel particulate filter regeneration describe how electric heating can cut the fuel penalty compared with fuel-based regeneration in the engine tested, with reductions of up to about half reported in that work. That study concerned a light-duty vehicle engine, not a stationary generator, so it is only a pointer: the direction of the finding may carry over, but the numbers do not. DieselNet’s page on particulate filter regeneration sets out the full range of regeneration methods.

Ten buyer considerations

Use these as the rows of your comparison. For each, ask the supplier to state how their device addresses it, and ask for evidence.

1. Electrical supply and generator sizing

Electric heater. A heater of several kilowatts must be fed from a DG-backed board, with suitable cable, protection and contactor. The generator must have spare capacity while the heater runs. See RECD controller and heater power supply requirements and does an RECD change a generator’s usable power output.

Fuel-assisted. Electrical demand is smaller, though pumps, blowers and igniters still need power.

What to ask. Total electrical load of the regeneration system, supply voltage tolerance, inrush and what happens if supply is lost mid-cycle.

2. Fuel handling and site safety

Electric heater. No added fuel hazard.

Fuel-assisted. Needs a fuel supply line, filter and shut-off to the exhaust zone, plus controls for ignition failure and fuel leakage. Check fire and safety requirements for the plant room and the approvals needed from your safety team or insurer.

What to ask. Fuel line routing, leak detection, flame monitoring, fail-safe behaviour and the supplier’s hazard analysis.

3. Behaviour at light load

Electric heater. At light load, exhaust flow is low and cool. Heater energy has less gas to heat, which in some designs makes light-load regeneration easier, but the soot is often wetter, which complicates burning. See RECD regeneration after wet stacking.

Fuel-assisted. Burners need enough oxygen in the exhaust stream. At very low load oxygen is plentiful, but at high load it falls and exhaust flow is high. The supplier should state the load range in which the system works.

What to ask. The supported load window for regeneration, and test evidence at your typical load.

4. Speed and duration of a cycle

Both approaches can be designed for cycles of tens of minutes. Duration depends on the heat input, soot load and design. Ask for typical and maximum durations from commissioning data, and read our guide on what a rising regeneration duration tells you so that you know what trend to monitor.

5. Energy and fuel cost per cycle

See the worked example later in this article. Ask for measured energy per cycle in kWh or litres, and read how to measure it in our article on RECD regeneration energy per cycle.

6. Maintenance and wear items

Electric heater. Elements, contactors, thermocouples, terminals. Failures often show as a falling heater current or tripped breakers.

Fuel-assisted. Nozzles, pumps, igniters, flame sensors, solenoid valves, fuel filters. Fuel quality matters, and fouling is a recurring concern.

What to ask. Recommended inspection intervals, list of spares and expected life, and who services each part. See RECD spare parts: what to request.

7. Controls and data

Whichever method is used, the controller should log start, end, ΔP, temperatures and energy input, and should report failures clearly. Our guides on interpreting an RECD regeneration completion message and what an RECD regeneration history report should include set out the evidence you should be able to extract.

What to ask. Which parameters are logged, how long they are kept and how they can be exported.

8. Failure modes and fail-safes

Electric heater. Typical failures are open-circuit elements, tripped breakers and contactor welding. The worst case is a stuck-on heater, which should be covered by temperature limits and independent protection.

Fuel-assisted. Failures include no ignition, fuel flooding, flame-out and sooted nozzles. Safety logic must stop fuel flow when ignition or flame is not confirmed.

What to ask. A table of failure modes, detection and controller response.

9. Interaction with the DG set and the building

Both methods add load or fuel use at moments you may not control. A heater-assisted cycle in the middle of a critical load might not be welcome. Operators need rules for what to do. See RECD regeneration while supplying building loads and RECD inhibit signals.

10. Warranty, service and local support

Ask who will service the heater or burner, how quickly and where spares are held. Compare warranty terms for these components specifically. See RECD warranty terms: parts, labour and exclusions and RECD service response commitments.

Buyer’s scorecard

Score each row from 1 (poor fit) to 5 (strong fit) for each option, using your site facts. Weights reflect what matters most to you; the weights below are an example only.

CriterionWeight (example)Electric heater scoreFuel-assisted scoreNotes
Spare electrical capacity on the DG15%Low spare capacity lowers the heater score
Plant-room fuel and fire safety acceptance15%Strict rules lower the fuel-assisted score
Light-load duty15%Check each supplier’s tested load window
Operator skill and training10%
Maintenance capacity on site10%
Data and logging quality10%
Energy or fuel cost per cycle10%Use measured data
Supplier service coverage10%
Failure-mode transparency5%

Multiply each score by its weight, add the results and compare. The score is only a conversation tool. A very low score on safety or electrical capacity can outweigh everything else, so mark such rows as “must pass” rather than relying on weights.

Matching four site profiles

The following matches are illustrative reasoning, not recommendations for any real site. Your own data decides.

Profile A: Hospital with a large essential board and strict fire rules

The DG set carries a steady load but has frequent short exercise runs. The plant room is inside the building with tight fire safety requirements. Electrical capacity is generous because the DG is sized for critical loads.

Likely lean. Electric heater, if the DG can carry the added load and the heater is fed from the essential board. Fuel handling inside a building plant room would face closer scrutiny.

Profile B: Remote telecom site with a small DG and no operator

Small sets, low spare capacity, long unattended periods, remote location and limited technician visits. See RECDs for telecom sites.

Likely lean. It depends. A heater needs spare capacity that a small set may lack, while a burner adds maintenance for a site that few people visit. A design that relies on passive regeneration, with occasional loaded runs, may suit better than either. Ask for evidence at your load.

Profile C: Factory with a large DG, steady daytime load and a maintenance team

The set runs for long hours at moderate to high load. A maintenance team can service equipment. Fuel is already on site.

Likely lean. Either may work. Passive regeneration may carry most of the duty, so the assisted system is only a backup. The decision may rest on service support and cost per cycle.

Profile D: Event venue with sets that run rarely and at light load

Short runs at light load, long idle periods, damp conditions after events. See RECDs for banquet halls.

Likely lean. Assisted regeneration may help, but the main problem is duty. A loaded test routine and good moisture protection matter as much as the choice of heater or burner. See RECD for occasionally used DG sets.

A worked energy illustration

The figures below are illustrative assumptions, not measurements of any product. Replace them with supplier data.

Assumptions.

  • Heat energy actually delivered to the exhaust and filter per cycle: 2.7 kWh (this matches the heater log in our worked measurement example).
  • Cycles per year: 50.
  • DG fuel consumption for electrical output: 0.30 litres per kWh.
  • Diesel energy content: about 10 kWh per litre (lower heating value).
  • Fuel-assisted system converts about 80% of fuel energy into useful heat to the exhaust (assumed).
  • Diesel price: ₹90 per litre (assumed).

Electric heater powered from the DG.

  1. Electrical energy per cycle: 2.7 kWh, assuming the heater converts nearly all electricity to heat.
  2. DG fuel per cycle: 2.7 × 0.30 = 0.81 litres.
  3. Cost per cycle: 0.81 × 90 = about ₹73.
  4. Annual: 50 × 73 = about ₹3,650, or 40.5 litres.

Fuel-assisted.

  1. Fuel energy needed: 2.7 ÷ 0.80 = 3.375 kWh.
  2. Fuel per cycle: 3.375 ÷ 10 = about 0.34 litres.
  3. Cost per cycle: 0.34 × 90 = about ₹31.
  4. Annual: 50 × 31 = about ₹1,550, or 17 litres.

What the illustration shows. When the DG supplies the electricity, an electric heater uses roughly twice the diesel of a direct-fuel system because a generator converts only about a third of its fuel energy into electricity. But the absolute amounts are small: a few thousand rupees a year in this example. For most buyers, safety, reliability, maintenance and service matter more than the energy cost per cycle. If the heater could run from grid electricity when available, the comparison changes again, but you cannot rely on that during outages.

A real system also has parasitic loads (blowers, pumps, controller), heat losses and different cycle lengths. Ask the supplier for measured energy per cycle.

Questions to put to suppliers

Copy this list into your RFQ. Our guide on writing a technical RFQ for an RECD project shows how to structure them.

  1. Which regeneration methods does the device use: passive only, electric heater, fuel-assisted or a combination?
  2. For assisted designs, what is the heat input in kW and the typical cycle duration?
  3. What is the measured energy per cycle in kWh or litres at our load range?
  4. What electrical supply is needed (voltage, power, protection), and what happens if it is lost?
  5. For fuel-assisted designs, how is fuel supplied, controlled and shut off, and which safety devices are fitted?
  6. At what DG loads does regeneration work, and what is the evidence?
  7. How does the controller detect heater or burner failure, and what alarms result?
  8. What data are logged for each cycle and how can we export them?
  9. Which parts wear, how often should they be inspected and what spares do you recommend?
  10. Who services the heater or burner, with what response time?
  11. Can you provide a reference installation with similar duty?
  12. What does the warranty say about heaters, burners, nozzles and fuel quality?

Red flags in supplier answers

  • No measured energy per cycle, only “low power consumption”.
  • No statement of the operating load window.
  • A heater specified without a supply drawing.
  • Fuel-assisted design without a clear description of flame monitoring and fail-safe shut-off.
  • “Maintenance-free” claims for heaters or burners. See what a maintenance-free RECD claim actually means.
  • Reluctance to share failure modes or reference sites.

When neither method is the right answer

Sometimes the honest conclusion from a scorecard is that assisted regeneration is not needed, or not enough.

  • The duty already regenerates the filter. A set that runs for hours at 50% load or more may clear soot passively, making a heater or burner an expensive spare part. Check with a load log before paying for it. See using DG load logs to assess RECD suitability.
  • The duty is so light that no regeneration method can cope. A set that idles for weeks needs a change in how it is used, which no heater can replace.
  • The site can swap filters instead. Some designs are intended to be removed and cleaned off-site at intervals, making on-board regeneration less important.
  • The generator can be changed. In some cases the better long-term answer is to replace the set. See RECD versus a new CPCB IV+ genset cost comparison.

A short acceptance test for assisted regeneration

Whatever you buy, ask for a witnessed acceptance test of the regeneration system, written into the order. A workable outline is below, to be adapted with the supplier.

  1. Preconditions. DG at an agreed stable load, soot loaded to a stated ΔP, instruments calibrated.
  2. Trigger. Start a cycle through the normal controller route, not a special test mode.
  3. Record. ΔP, inlet and bed temperatures, heater current or fuel flow, energy or fuel used, duration and any alarms.
  4. Pass criteria. ΔP recovery to an agreed value at the same load, peak temperature within the stated range, no alarms, energy or fuel within an agreed tolerance of the quoted figure.
  5. Interruption test. Where safe and agreed, check that the controller behaves as promised if the cycle is interrupted.
  6. Report. A signed record with all values, kept in the asset file.

See RECD trial installation acceptance criteria and factory acceptance versus site acceptance tests for RECD projects for how this fits into the wider project.

After you decide: make it work

Whichever method you choose, make the following part of the project.

FAQ

Which is better for a DG set, an electric heater or a fuel burner?

Neither is better everywhere. The right choice depends on spare electrical capacity, plant-room safety rules, load pattern, maintenance capability and supplier support. Many sites do best with a design that relies mostly on passive regeneration and uses assisted regeneration as a back-up.

Does an electric heater need a lot of generator capacity?

Heaters for DG-mounted devices are often in the range of several kilowatts, but sizes vary by design. The heater runs only during a cycle. Ask the supplier for the figure for your device and check that your generator and board can carry it.

Is fuel-assisted regeneration dangerous?

It adds fuel, ignition and hot surfaces to the exhaust area, so it needs proper safety design and maintenance. With flame monitoring, fail-safe shut-off and a good installation it can be used safely, but it requires more safety review than an electric heater.

Can I add a heater to an RECD that doesn’t have one?

Sometimes, but it depends on the design. Adding a heater changes the electrical, thermal and control arrangements, so ask the supplier before making any change, and keep the warranty position in mind.

What if my DG runs at very light load?

Assisted regeneration can help, but the underlying duty problem remains: long light-load running loads the filter with wet soot. Plan loaded runs and read our guide to choosing an RECD for a generator running at low load.

Does the choice affect emission test results?

Regeneration timing can influence test results, since sampling during or just after a cycle can show different efficiency. See RECD testing during regeneration: what to record.

Bringing it together

Electric-heater and fuel-assisted RECD regeneration solve the same problem in different ways. The heater trades fuel handling for electrical demand. The fuel-assisted system trades electrical demand for fuel handling and burner maintenance. Compare them on ten points: supply, safety, light-load behaviour, cycle time, energy cost, maintenance, controls and data, failure modes, interaction with the building and service support. Use the scorecard, match it to your site profile, ask for measured numbers and write your requirements into the order.

To discuss which approach suits your DG set, see our range of retrofit emission control devices, check our certifications or contact the Aceget team.

Related Reading



1 Comment

Leave a Reply