When a company runs factories in several states, each plant tends to buy its Retrofit Emission Control Devices (RECDs) in its own way. One site writes a two-line enquiry, another copies a tender from a neighbouring company, a third relies on whatever the local DG dealer suggests. A year later, head office finds five different alarm lists, three data formats, warranty terms that range from six months to three years, and no simple way to answer the question “are our RECDs working?”
A corporate standard fixes this, but only if it is written with care. Standardise too little and nothing improves. Standardise too much and you force a 1,000 kVA basement set in Noida and a 200 kVA yard set in Hosur into the same box, which neither the engineering nor the regulators will accept.
This post sets out a practical framework for deciding what to fix centrally and what to leave local. It then covers the corporate template, naming conventions, vendor approval, a central test protocol, reporting KPIs and change control, followed by an illustrative example of a company with five plants in four states and a sample clause list you can adapt.
The Core Rule: Fix Outcomes and Interfaces, Leave Physics Local
The most useful test is to ask three questions about every item you are thinking of standardising:
- Does it need to be comparable across sites? If head office must compare it (performance, alarms, data, uptime), fix it centrally.
- Does it depend on the engine, the building or the state? If it changes with displacement, exhaust route, climate or consent, leave it local but make the local team record it in a fixed format.
- Does a single choice give buying or support leverage? Warranty terms, spare parts lists and service levels are easier to negotiate once than five times.
Put another way, the centre owns what the device must achieve and how it talks to the rest of the business. The site owns how the device fits the particular engine and building.
| Decision area | Centrally fixed | Locally decided | Locally recorded in a central format |
|---|---|---|---|
| Performance | Minimum PM reduction and acceptance basis | None | Test results per set |
| Certification | Required evidence and validity check | None | Certificate reference per device |
| Device sizing | Sizing method and data required | Final size per engine | Engine data sheet |
| Exhaust and mounting | Design review checklist | Route, supports, location | GA drawing |
| Monitoring | Signal list, alarm list, data format | Controller location, cable route | Tag register |
| Consent | Requirement to comply | Engagement with the SPCB | Consent condition summary |
| Commercials | Warranty, service levels, spares | Local installation contractor | Purchase order reference |
The reason sizing stays local is technical. An RECD is matched to engine displacement, exhaust flow and duty, so two sets of the same rating can need different devices. Our post on why same-kVA DG sets can need different RECDs explains this. The standard should fix the method, not the answer.
Part 1: The Corporate Specification Template
The template is the document every plant attaches to its enquiry. It should be short enough to read and firm enough to compare offers. Eight sections usually cover it.
Performance requirement
State the requirement as a measurable outcome: at least 70% PM reduction, consistent with the CPCB requirement, demonstrated on the specific engine under defined load conditions. Define the load points, warm-up time and test method. Vague wording such as “suitable for emission control” gives vendors nothing to be held to. Our guide on writing measurable RECD tender specifications has model wording.
Certification
Require CPCB type-approval evidence and a check that the offered device falls within the approved range for the engine. Note that the CPCB RECD certification framework covers engines up to 800 kW gross mechanical power. For larger engines, the standard should tell sites to confirm the state board’s requirement, which may be a tested device with at least 70% reduction. The CPCB website is the reference point for current guidance.
Monitoring outputs
List the minimum signals the RECD controller should provide if it offers outputs: differential or back-pressure, exhaust temperature before and after the device, regeneration status, fault status and run state. Specify the physical interface (for example, potential-free contacts for alarms and a serial or network protocol for data). If you specify a protocol such as Modbus, refer to the Modbus Organization specifications and require a register map with units and scaling. Our post on RECD Modbus data units, scaling and register mapping shows what that map should contain.
Alarm list
Fix a short, common list of alarms with consistent names and priorities: high back-pressure warning, high back-pressure critical, sensor fault, regeneration failure, controller power loss and communication loss. Sites can set thresholds within limits the standard defines, but they should not rename alarms. Our RECD alarm response matrix for operators gives a model for linking each alarm to an action.
Data format
Require timestamps in ISO 8601 format with the IST offset (+05:30), SI units, one row per logging interval, and a fixed column order. This sounds minor, but it is what makes a five-plant dashboard possible without manual clean-up. Our post on what to record in an RECD event log lists the fields.
Documentation
Every set should receive the same document pack: general arrangement drawing, back-pressure calculation, certificate copy, test report, operation and maintenance manual, spare parts list, wiring diagram and register map.
Warranty
Fix the minimum warranty period, what it covers (parts, labour, travel) and the exclusions the company will accept. See our guide on RECD warranty terms, parts, labour and exclusions.
Service levels
Fix response times by severity, for example remote support within a set number of hours for a critical alarm and a site visit within a set number of days. Response expectations may differ for metro and remote plants, but the categories and reporting should be the same. Our post on RECD service response commitments covers how to define them.
Part 2: The Local Variables
Local variables are not gaps in the standard. They are the inputs the standard requires each plant to supply, using a fixed data sheet.
| Local variable | Why it cannot be fixed centrally | What the site must record |
|---|---|---|
| DG rating and engine data | Every engine is different | Make, model, serial, displacement, kW, OEM back-pressure limit |
| Exhaust route | Depends on the building | Pipe size, length, bends, silencer type, outlet height |
| Space and access | Basement, rooftop, canopy or yard | Available envelope, lifting route, maintenance clearance |
| Climate | Dust, salt, humidity, heat, altitude | Ambient range and environmental concerns |
| Duty | Standby, prime, low load, cyclic | Typical load, monthly run hours, start frequency |
| State rules and consent | Each SPCB sets its own conditions | Consent reference, relevant conditions, renewal date |
State rules deserve special attention. A plant in Delhi NCR operates under GRAP restrictions that a plant in Tamil Nadu does not, and consent conditions differ between boards. Our comparison of state-wise pollution control norms for DG sets gives a starting overview, but the plant’s own consent document always governs.
Part 3: Naming and Tagging Conventions
A naming convention costs nothing to adopt and saves a great deal of confusion later. Use a fixed structure:
State code – plant code – DG number – RECD – signal
For example:
HR-MNS-DG02-RECDfor the RECD on DG set 2 at the Manesar plant in HaryanaHR-MNS-DG02-RECD-BPfor its back-pressure signalHR-MNS-DG02-RECD-TINand-TOUTfor inlet and outlet temperaturesHR-MNS-DG02-RECD-ALM-BPHfor the high back-pressure alarm
Apply the same tag on the physical label, the controller, the BMS point list, the maintenance system and every report. Keep a central tag register and do not allow sites to create new suffixes without approval. Use two-digit DG numbers so lists sort correctly.
Part 4: The Approved Vendor Approach
An approved vendor list gives you consistency without locking every plant into a single supplier. A practical approach:
- Qualify centrally. Head office checks certification, references, manufacturing capability, service network and willingness to accept the standard terms. Our guide on how to choose CPCB-approved RECD vendors lists the checks.
- Approve two or three vendors. One vendor gives leverage but creates dependence. Two or three keep competition alive.
- Let plants run the final selection. Each plant obtains offers from approved vendors against the corporate template plus its local data sheet.
- Require a deviation statement. Any departure from the standard must be listed by the vendor, not discovered later.
- Review annually. Vendor performance on response times, failure rates and documentation quality should decide whether they stay on the list.
Part 5: The Central Test Protocol
Test results are only comparable if every plant tests the same way. The protocol should be short and fixed:
- Record baseline conditions. Engine hours, recent service, fuel and ambient conditions.
- Warm up the set. Run to a stable exhaust temperature for a defined period before measuring.
- Hold defined load points. For example, 50% and 75% of rated kW, held long enough for readings to stabilise. Load must be matched between before and after tests.
- Measure PM before and after the device using the method and agency type the standard names.
- Record back-pressure and temperatures at each load point.
- Note regeneration state at the time of the test.
- Report in the central template, including any deviations from the protocol.
Our posts on planning before-and-after RECD emissions tests and factory vs site acceptance tests explain the reasoning behind each step.
Part 6: Central Reporting KPIs
Choose a small set of KPIs that every plant reports monthly in the same format.
| KPI | Definition | Illustrative target |
|---|---|---|
| Data availability | Hours of valid RECD data ÷ DG run hours | 95% or higher |
| Alarm response | Critical alarms acknowledged within 30 minutes ÷ total critical alarms | 95% or higher |
| Back-pressure compliance | Run hours within the normal band ÷ total run hours | 98% or higher |
| Open faults | RECD faults open for more than 7 days | Zero |
| Test currency | Sets with a valid performance test ÷ total fitted sets | 100% |
| Service response | Vendor visits within agreed time ÷ total visits requested | 90% or higher |
Keep the dashboard plain. Our post on what to show on an RECD operating dashboard suggests a layout.
Part 7: Governance and Change Control
A standard that cannot change will be ignored. A standard that changes casually will be meaningless. Both problems are avoided with simple change control:
- Name an owner. Usually the corporate engineering or EHS head.
- Version every issue. Number the standard (for example, Rev 1.0, Rev 1.1) and date each revision.
- Use a change request form. Any plant can propose a change, with the reason and evidence.
- Review at a fixed interval. A quarterly review is usually enough, with urgent changes handled separately.
- Separate deviations from changes. A deviation applies to one set and one reason. A change applies to the whole company.
- Do not apply changes retrospectively unless there is a safety or compliance reason. Record which revision each installed set was built to.
Signs the standard is drifting
Watch for a few warning signs in the monthly reports and project files:
- Rising deviation counts. If most new orders carry the same deviation, the clause is probably wrong and should be changed rather than waived again and again.
- Local tags appearing. New signal names in a plant’s BMS that are not in the central register mean someone has bypassed the convention.
- KPIs reported in different ways. If one plant counts alarms per event and another per day, the numbers cannot be compared, however neat the dashboard looks.
- Old revisions in enquiries. A plant attaching Rev 1.0 after Rev 1.2 has been issued shows the distribution list needs fixing.
Rolling Out the Standard: A Practical Sequence
A standard lands better when plants see it working before it becomes mandatory. A sensible order is:
- Draft with two plants. Write the first version with the maintenance leads from one large and one small plant, so the clauses survive contact with real DG rooms.
- Pilot on one order. Use the draft for the next RECD purchase and note every clause that caused confusion or a deviation.
- Issue Rev 1.0. Correct the draft, publish it with the local data sheet, tag register and KPI template, and brief every plant.
- Back-fill existing installations. Sets fitted before the standard should at least be tagged, added to the KPI report and given the standard alarm names where the controller allows it.
- Hold the first review. After one quarter, review KPIs, deviations and vendor feedback, then issue Rev 1.1 if needed.
Worked Example: Five Plants in Four States (Illustrative)
The following example is illustrative. The company, plants and figures are invented to show how the framework works.
An auto component company has five plants in four states and 14 DG sets in total.
| Plant | State | DG sets | Ratings (kVA) | Total kVA | Key local variable |
|---|---|---|---|---|---|
| Manesar (MNS) | Haryana | 4 | 2 × 500, 2 × 320 | 1,640 | GRAP restrictions, NCR consent conditions |
| Noida (NDA) | Uttar Pradesh | 3 | 1 × 750, 2 × 250 | 1,250 | Basement DG room, long exhaust route |
| Chakan (CHK) | Maharashtra | 2 | 2 × 625 | 1,250 | Rooftop exhaust outlet |
| Ranjangaon (RJN) | Maharashtra | 2 | 2 × 380 | 760 | Dusty yard installation |
| Hosur (HSR) | Tamil Nadu | 3 | 1 × 500, 2 × 200 | 900 | Older mechanical engines on the 200 kVA sets |
Totals: 4 + 3 + 2 + 2 + 3 = 14 sets, and 1,640 + 1,250 + 1,250 + 760 + 900 = 5,800 kVA.
What the centre fixed
The corporate team issued Rev 1.0 of the standard with the performance requirement, certification check, alarm list, data format, document pack, warranty and service levels. It approved three vendors after reference checks. Every set was tagged using the convention, for example MH-CHK-DG01-RECD and TN-HSR-DG03-RECD.
What the plants decided
Each plant completed the local data sheet. Noida flagged its long basement exhaust route, so the back-pressure budget became the main selection constraint. Chakan’s rooftop outlet needed a structural review. Ranjangaon asked for extra attention to dust ingress. Hosur’s two 200 kVA mechanical sets were assessed for condition before fitment, following the approach in our guide to planning RECD fitment across DG sets of different makes and ages. Manesar timed its work to finish before the winter GRAP period.
Reading the first month’s KPIs
In the first month after fitment, Noida reported 186 DG run hours across its three sets but valid RECD data for only 171 hours. Data availability was 171 ÷ 186 = 0.919, or 91.9%, below the 95% target. Investigation found a loose communication cable on one controller.
Hosur recorded 20 critical alarms, of which 18 were acknowledged within 30 minutes. Alarm response was 18 ÷ 20 = 90%, also below target. The cause was a shift handover gap, fixed by adding the alarm check to the handover sheet.
Because both plants used the same definitions and formats, head office could see the issues in one report and compare them directly with the other three plants.
A change request in practice
Ranjangaon proposed adding a dust-related inspection item to the standard maintenance checklist. The owner reviewed it, agreed it was useful for any dusty site, and issued Rev 1.1 with the item as a conditional requirement for sites flagged as dusty. The other plants were not forced to adopt it.
Sample Standard Clause List
The clauses below are an illustrative starting point. Adapt the wording with your engineering, EHS and legal teams.
| Clause | Subject | Summary |
|---|---|---|
| STD-01 | Scope | Applies to all RECDs fitted to company DG sets at all plants |
| STD-02 | Performance | Minimum 70% PM reduction on the specific engine, demonstrated per STD-09 |
| STD-03 | Certification | CPCB type-approval evidence within approved range; above 800 kW gross, confirm SPCB requirement |
| STD-04 | Sizing | Vendor to size from site engine data sheet and provide back-pressure calculation |
| STD-05 | Monitoring | Minimum signal set and interface as listed in Annex A |
| STD-06 | Alarms | Fixed alarm names and priorities per Annex B; thresholds within defined limits |
| STD-07 | Data | ISO 8601 timestamps with IST offset, SI units, fixed column order |
| STD-08 | Tagging | Tags per Annex C convention; central register maintained by owner |
| STD-09 | Testing | Central test protocol, matched load, warm-up, reported in standard template |
| STD-10 | Documentation | Standard document pack delivered before handover |
| STD-11 | Warranty | Minimum period and cover as defined; exclusions listed in offer |
| STD-12 | Service | Response times by severity; monthly service report |
| STD-13 | Vendors | Supply only from the approved vendor list, with a deviation statement |
| STD-14 | KPIs | Monthly reporting of KPIs defined in Annex D |
| STD-15 | Change control | Revisions via change request; deviations recorded per set |
Frequently Asked Questions
Should every plant use the same RECD model?
No. The standard should fix performance, interfaces and terms, not the model. Each set needs a device sized to its engine and duty, so different plants will often end up with different sizes or even different vendors from the approved list.
Who should own the standard?
Usually the corporate engineering or EHS head, with input from plant maintenance teams and procurement. The owner approves changes and keeps the tag register and revision history.
How do we handle state-specific consent conditions?
Leave them local. The standard should require each plant to comply with its own consent and to record the relevant conditions in a fixed format. Plants should engage their own SPCB directly.
What if a vendor cannot meet one clause?
Ask for a written deviation and assess it. Accept it for that set only if the reason is sound and the risk is understood. Record it against the set, and consider whether the standard itself needs to change.
How often should the standard be reviewed?
A fixed review every quarter or every six months suits most companies, with urgent changes handled as needed. Review KPIs, deviations and vendor performance at the same meeting.
Related Reading
- Scheduling RECD Work Around a Factory’s Annual Shutdown
- Who Owns RECD Performance When Generator Operation Is Outsourced?
- How to Write a Technical RFQ for an RECD Project
- Integrating RECD Monitoring with a Building Management System
Build Your Multi-Site RECD Standard with Aceget
A good corporate standard fixes outcomes, interfaces and terms, and leaves engine-specific engineering to each plant. Aceget supplies CPCB type-approved Retrofit Emission Control Devices for DG sets from 25 kVA to 2500 kVA. Review our certifications, and contact our team to discuss how your plants’ DG sets fit into a common specification.