Most business continuity plans in India already cover the diesel generator. They describe what happens when the grid fails, who starts the set, how long the fuel lasts and when to call for a rental. Very few say anything about the retrofit emission control device (RECD) bolted to the exhaust.
That gap matters more than it first appears. An RECD fault rarely cuts power by itself. The generator usually keeps running. What the fault does is create a decision: keep running and accept a compliance or engine risk, or stop and accept a continuity risk. During a long outage, in the middle of a GRAP restriction or on the morning of an inspection, that decision lands on whoever happens to be on shift, often with no guidance at all.
This post shows how to write the RECD into your business continuity plan (BCP), section by section in the order a BCP normally follows, ending with a worked tabletop exercise.
1. Scope: what this section of the plan covers
A short scope statement keeps the section focused. A sample (adapt it to your site):
This section covers faults, alarms and failures of the retrofit emission control devices fitted to the site’s DG sets, and the effect of those faults on backup power availability, emission compliance and engine health. It applies to all DG sets listed in Annex A, during grid outages, planned testing and periods of air quality restriction.
Then list each DG set with its rating, the loads it supports, its RECD model and serial number, the supplier contact, whether it is standby, prime or part of a redundant group, and the consent conditions that apply.
2. Business impact analysis
The business impact analysis (BIA) asks what happens to the organisation if a function is disrupted, and how quickly the disruption becomes unacceptable. For RECDs, the “function” is clean, available backup power. The BIA should separate three types of impact, because they unfold on different timescales.
| Impact type | What it looks like | How fast it becomes serious | Who feels it |
|---|---|---|---|
| Continuity | The DG must stop or derate, so critical loads lose backup | Minutes to hours, depending on the outage and UPS autonomy | Operations, customers, patients, tenants |
| Compliance | The set runs with a faulty or bypassed RECD, or without evidence of performance | Hours to days; immediate during GRAP or an inspection | EHS, legal, management |
| Engine and asset | High back-pressure or overheating damages the engine or turbocharger | Minutes to hours under high load | Maintenance, finance |
Rate each DG set
Score each set for how critical its loads are and how exposed it is to an RECD fault. A simple scale of 1 to 3 works for most sites.
| DG set (illustrative) | Load criticality (1–3) | Redundancy available? | Typical outage exposure | Priority |
|---|---|---|---|---|
| DG-1, 750 kVA, data hall | 3 | Yes, N+1 | Short, frequent | High |
| DG-2, 500 kVA, process line | 3 | No | Long, seasonal | Very high |
| DG-3, 160 kVA, office block | 1 | Grid only | Short | Low |
A set with critical loads and no redundancy needs the most detailed RECD plan. A set with spare capacity elsewhere can usually be stopped while the fault is investigated, which makes the decision simpler. Sites with redundant sets should also read sequencing RECD installations on N+1 generators, because the same logic applies to faults.
Define the maximum tolerable period
For each high-priority set, write down how long the business can tolerate:
- Losing that set completely.
- Running it with an RECD alarm that has not yet been diagnosed.
- Running it with a confirmed RECD fault while waiting for repair.
These periods are not the same, and the last one may be very short or zero where consent conditions or GRAP rules apply. Write them down as targets agreed with management, not as permissions to break rules.
3. Fault scenarios
A few realistic scenarios work better than an exhaustive list. These six cover most RECD situations, each with a trigger, a likely impact and the first question to answer.
Scenario A: RECD controller failure
Trigger: the controller shows a fault, goes blank or stops communicating with the BMS. Likely impact: loss of monitoring and possibly loss of any active regeneration control. The filter itself may be working normally. First question: is this a controller or sensor fault, or a real problem in the exhaust? Our guide on separating a sensor fault from an RECD performance problem helps here.
Scenario B: high back-pressure
Trigger: back-pressure alarm, rising trend, black smoke, engine losing power or overheating. Likely impact: risk to the engine if it continues at high load. This is the scenario most likely to force a stop. First question: is the reading genuine, and how close is it to the engine maker’s limit? Background reading: how exhaust back-pressure affects a DG set.
Scenario C: cracked or damaged substrate
Trigger: sudden drop in back-pressure, visible smoke downstream, soot at the outlet, or damage found during service. Likely impact: the engine is not at risk, but particulate may bypass the filter. This is mainly a compliance issue. First question: can the set be replaced by another set or rental while the device is repaired?
Scenario D: regeneration failure during a long outage
Trigger: a long grid outage at low or fluctuating load; the filter loads up because exhaust is not hot enough for passive regeneration, or an active regeneration cannot complete. Likely impact: back-pressure climbs over hours. The fault develops slowly, which gives time to act if someone is watching. DieselNet’s overview of DPF regeneration explains why load and temperature matter. First question: can load be increased or shifted to help regeneration, or can the set be rotated with another?
Scenario E: fault during GRAP restrictions
Trigger: any of the above while GRAP restrictions apply in Delhi NCR. Likely impact: the compliance consequence of running is higher, and rental options may also be restricted. See how GRAP restrictions affect businesses using DG sets. First question: what do the current rules allow, and which loads are essential enough to justify the alternatives?
Scenario F: fault found during an inspection
Trigger: an inspector or auditor finds an alarm, a missing record, a damaged device or a bypass. Likely impact: possible notice, sealing or penalty, plus reputational damage. See what happens during a pollution control board inspection. First question: what records can the site show immediately to demonstrate that the fault was known and being managed?
4. Decision authority
This is the section most BCPs leave out, and it is the most important. When an RECD fault appears during an outage, someone must decide whether the set keeps running, runs at reduced load or stops. Without a named decision-maker, the shift operator either guesses or waits, and both can go badly.
Principles to write into the plan
- Engine protection is not negotiable. If the DG maintainer or the engine’s own protection says stop, the set stops. Engine-protection settings sit with the DG maintainer and the engine maker, not with the BCP.
- The plan does not pre-approve breaking consent conditions. It defines who decides, on what information and how quickly. Where a fault means the set cannot lawfully run, the plan moves straight to alternatives.
- Decisions are recorded. Every decision to continue, derate or stop is logged with the time, the person and the reason.
- Escalation is time-bound. If the first decision-maker cannot be reached in a set time, the next person decides.
A decision authority matrix (example)
| Decision | Shift operator | Facility / maintenance manager | EHS lead | Site head |
|---|---|---|---|---|
| Stop the set on engine protection trip or maintainer instruction | Acts immediately | Informed | Informed | Informed |
| Acknowledge alarm and start diagnosis | Acts | Informed within 15 min | Informed | |
| Continue running with an undiagnosed RECD alarm (within agreed limits) | Recommends | Decides, up to agreed period | Consulted | Informed |
| Reduce load or shed non-essential loads | Acts on instruction | Decides | Informed | Informed |
| Continue running with a confirmed fault | Recommends | Advises on compliance | Decides, within legal limits | |
| Call rental DG cover | Recommends | Consulted | Approves spend | |
| Notify the regulator | Provides facts | Prepares and recommends | Approves |
Adapt the roles to your organisation (in a hospital, the site head might be the medical superintendent’s office). The point is that each row has one clear owner. The alarm philosophy behind this kind of matrix is set out in alarm management guidance such as ISA-18.2, and our RECD alarm response matrix for operators gives a ready-made starting point.
5. Pre-agreed responses
Pre-agreed responses turn the decision matrix into actions. They should be short enough to fit on a laminated card in the DG room.
| Scenario | Immediate action (first 15 minutes) | Next action (within 2 hours) | Fallback |
|---|---|---|---|
| A: controller failure | Check power to controller; record readings from any local gauges; inform manager | Supplier remote or phone diagnosis; increase manual checks | Swap to standby set; request controller replacement |
| B: high back-pressure | Read value and trend; compare with limit; reduce load if near limit | Maintainer assessment; try supplier-advised regeneration step if safe | Stop set; transfer load to other set or rental |
| C: cracked substrate | Record evidence; photograph outlet; inform EHS | Plan to replace set in service; supplier inspection | Stop set when alternative available |
| D: regeneration failure | Check load and exhaust temperature; consider load increase or rotation | Supplier advice; plan controlled regeneration when outage ends | Rotate sets; rental cover for long outages |
| E: fault during GRAP | Apply scenario response; check current GRAP stage rules | Shed non-essential loads; EHS confirms position | Rental or alternative supply as rules allow |
| F: fault found in inspection | Cooperate; provide event log and records; do not argue facts on the spot | Written summary of fault and actions to the inspector as required | Repair plan with dates; follow-up evidence |
The card should also list the phone numbers of the DG maintainer, the RECD supplier, the rental provider and each decision-maker, with deputies.
6. Spares and supplier response
A plan that says “call the supplier” is only as good as the response and the spares on hand.
Spares to consider holding on site
- Pressure and temperature sensors of the types fitted, with cables and connectors.
- Gaskets and clamps for the RECD flanges.
- Controller fuses, and possibly a spare controller for high-priority sets.
Our RECD spare parts list explains what to ask the supplier for and how to decide quantities.
Supplier response terms
Agree in writing:
- The hours during which the supplier will respond by phone, and the target response time.
- Whether remote diagnosis is possible.
- Target time for a site visit in your city.
- How replacement parts are dispatched, and from where.
See RECD service response commitments for the terms worth negotiating. Then check that the BCP’s maximum tolerable periods are consistent with those commitments. If the BIA says DG-2 cannot be down for more than six hours but the supplier can only visit within 48 hours, the gap must be filled by spares, redundancy or rental.
7. Rental DG cover
For sets with critical loads and no redundancy, rental cover is often the most reliable fallback. It needs planning, because rental sets are scarce during long regional outages and during GRAP periods.
Points to settle in advance:
- Which rental provider, and what terms? A standing arrangement or framework agreement is better than a phone call during a crisis. Our guides on diesel generator rental cost in India and installing an RECD on a rented DG cover the commercial and emission side.
- Emission status of the rental set. A rental set that does not meet the rules in force may not solve the problem during GRAP.
- Connection point. Is there a ready connection point, cable route and space for a rental set? If not, it may take a day to connect.
- Fuel and operation. Who fuels and operates the rental set, and who keeps its records?
8. Communications
An RECD fault can affect several audiences. The plan should say who tells whom, when and how.
Internal
The shift operator phones the facility manager immediately; the manager informs the EHS lead and site head within the times in the decision matrix. Operations teams get updates if loads are shed, and management gets an end-of-event summary.
Regulator
Whether and when to notify the pollution control board depends on your consent conditions and the situation. The plan should say who decides and who prepares the message, not assume an answer. Keep factual records ready: the fault, the time, actions taken and the repair plan. The CPCB website and your SPCB are the authoritative sources for current requirements.
Neighbours and occupants
In residential societies, hospitals, malls and campuses, visible smoke or odour from a faulty set can trigger complaints. A short, honest message (“we are aware of an issue with emission equipment on one generator and are working to fix it”) is better than silence. Agree in advance who may issue such messages.
9. Recovery and lessons learned
Recovery is not complete when the set runs again. Close the event properly:
- Repair and verify. Repair or replace the faulty part and confirm normal readings at a known load.
- Decide on retesting. Major repairs, such as a substrate replacement, may justify a fresh emissions test. See when to retest an RECD after DG set changes.
- Complete the records. Update the event log, the decision log and the maintenance file.
- Hold a review within two weeks. What happened, what went well, what was slow, and what should change?
- Update the plan. Change contact lists, spares, response times or decision limits as the review recommends.
Recurrent faults are a signal. A set that loads its filter every monsoon outage may need a different operating pattern, more frequent maintenance or a supplier review of its duty. The RECD maintenance guide covers the routine side.
10. Testing the plan: a tabletop exercise
A plan nobody has rehearsed tends to fail at the first real event. A tabletop exercise is the cheapest way to test it. The team sits together, a facilitator reads out a scenario in stages (“injects”), and participants say what they would do, using the plan and nothing else. No equipment is touched.
Running the exercise
- Duration: 90 minutes, plus 30 minutes for review.
- Participants: shift operator, DG maintainer, facility manager, EHS lead, a representative of the site head, and if possible the RECD supplier by phone.
- Facilitator: someone who knows the plan but is not a decision-maker in it.
- Scribe: records decisions, times and gaps.
- Materials: the BCP, the laminated response card, the contact list, the site layout and a clock.
Worked tabletop exercise (illustrative)
The scenario, times and readings below are illustrative. Adjust them to your site.
Setting: a pharmaceutical packaging unit in Faridabad with two DG sets. DG-A (500 kVA) supports the packaging lines and cold storage; DG-B (250 kVA) supports offices and utilities. There is no spare capacity for DG-A’s loads. It is a weekday in early November and GRAP Stage II restrictions are in force.
| Exercise clock | Inject (read out by facilitator) | Questions for participants |
|---|---|---|
| 10:00 | Grid supply fails across the industrial area. The DISCOM estimates restoration “after 6 pm”. Both DG sets start and pick up load. DG-A settles at 62% load. | Who confirms that both sets have started normally? What checks are made in the first 30 minutes? |
| 11:15 | DG-A’s RECD shows a high back-pressure warning (first stage). The reading is about 80% of the engine maker’s limit and rising slowly. | Who acknowledges the alarm? Who is informed and by when? Is this a sensor fault or a real problem, and how will you tell? |
| 11:40 | The maintainer confirms the reading is genuine; a local gauge agrees with the sensor. Exhaust temperature is lower than usual because two lines have been stopped for changeover, so load dropped to 45%. | Can load be raised or redistributed to help regeneration? Who decides? What does the supplier advise? |
| 12:30 | The supplier’s engineer, on the phone, suggests a period at higher load and confirms a visit is possible tomorrow morning, not today. | Does this fit the maximum tolerable period in the BIA? What is the fallback if back-pressure keeps rising? |
| 13:45 | Back-pressure reaches the second-stage alarm, about 92% of the limit. The engine is running normally. | Who decides between continuing, shedding load and stopping? Which loads can be shed? Is rental cover needed, and who approves the cost? |
| 14:00 | The rental provider can deliver a 500 kVA set by 18:00. It is unclear whether the rental set meets the rules that apply under the current GRAP stage. | Who checks the rental set’s emission status? What happens if it is not suitable? |
| 14:30 | A neighbouring unit’s manager calls to complain about smoke and says they will contact the pollution control board. | Who responds? What is said? Is a proactive message to the regulator needed, and who decides? |
| 15:10 | With non-essential lines shed, load is concentrated on the critical lines and cold storage at 70%. Back-pressure stabilises and then drops slowly as the filter regenerates. | What monitoring continues? When can the alarm be considered resolved? |
| 18:20 | Grid supply returns. DG-A is stopped normally. | What happens next: supplier visit, records, retesting decision, review meeting? |
What the facilitator should look for
- Did anyone hesitate because the decision owner was unclear?
- Did the team know the engine maker’s back-pressure limit, or did they have to search for it?
- Were the supplier and rental phone numbers correct and current?
- Did the team check GRAP rules before deciding on rental cover?
- Was every decision recorded with a time and a name?
- Did the external communication match what the plan allows?
Typical findings
Exercises like this often expose the same gaps: the back-pressure limit sits in a manual rather than on the response card, the rental agreement is silent on emission status, nobody knows who may speak to neighbours, there is no decision log, and the supplier’s contracted response time does not match the BIA.
Each finding should become an action with an owner and a date. Repeat the exercise yearly, and before each winter pollution season for sites in Delhi NCR. Review the RECD section itself after any real fault or near miss, and whenever a set, RECD, supplier or load criticality changes.
Frequently asked questions
Does an RECD fault mean the generator must stop immediately?
Not necessarily. Many faults, such as a controller or sensor fault, do not affect the engine. High back-pressure can, and the engine’s protection or maintainer’s instruction always takes priority. Whether a set may keep running with a confirmed fault also depends on consent conditions and any GRAP restrictions.
Who should be the final decision-maker for running with a fault?
Usually a senior person accountable for both operations and compliance, advised by the EHS lead and the DG maintainer. The important thing is that the plan names one person and a deputy, and that the decision is recorded.
Should we keep a spare RECD controller on site?
For high-priority sets with no redundancy, it may be worth it. For others, sensors, cables and gaskets are usually more useful spares. Discuss with your supplier, and weigh the cost against the BIA’s tolerable downtime.
How do we keep the plan practical for night shifts?
Keep the response card short, list deputies for every role and test the plan with night-shift staff. The first 15 minutes of a fault are usually handled by whoever is on duty, not by the person who wrote the plan.
Can a tabletop exercise replace a real test?
No. A tabletop exercise tests decisions and communication. It should be combined with periodic practical checks, such as confirming that spares fit, rental connection points work and contact numbers answer.
Build the RECD into your continuity planning
Aceget supplies CPCB type-approved Retrofit Emission Control Devices for DG sets from 25 kVA to 2500 kVA. If you are writing or updating a business continuity plan that covers DG sets with RECDs, talk to us early about spares, service response and documentation. You can review our certifications or contact our team.